BAYOU METO WATER MANAGEMENT DISTRICT - ORLICEK 1 AND 2, SANDAGE 1 PUMP SYSTEMS

Agency: Arkansas Democrat-Gazette
Level of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD15618348916856596
Posted Date: Nov 14, 2022
Due Date: Dec 1, 2022
Source: https://classifieds.arkansason...

BAYOU METO WATER
MANAGEMENT DISTRICT
Lonoke, Arkansas
BAYOU METO WATER MANAGEMENT DISTRICT ? ORLICEK 1 AND 2, SANDAGE 1 PUMP SYSTEMS
ADVERTISEMENT FOR BIDS
Sealed bids for BAYOU METO WATER MANAGEMENT DISTRICT ? ORLICEK 1 AND 2, SANDAGE 1 PUMP SYSTEMS, to be constructed for BAYOU METO WATER MANAGEMENT DISTRICT will be received at the office of Garver and addressed to Attn: Daniel Hollinger, 4701 Northshore Drive, North Little Rock, AR 72118, until 10:00 A.M. Thursday December 1, 2022, at which time the bids shall be publicly opened and read aloud.
The Project consists of the installation of three pumping systems at two locations adjacent to Indian Bayou in Lonoke County, AR. The pumping systems consist of a steel intake pipe, a standpipe, pump installed in the standpipe, pump motor, outlet piping, buried underground piping, all electrical components associated with the pump, and ancillary site work and appurtenances for the pumping systems. The pump systems consist of a pump station site with one 3,000 gallon per minute pump and one 5,000 gallon per minute pump and a pump station site with one 3,000 gallon per minute pump. The buried underground piping consists of approximately 13,000 linear feet of PVC irrigation pipeline.
Bids will be received for a single prime contract. Bids shall be on a unit price basis as indicated in the Bid Form.
Digital copies of the bid documents are available at http://planroom.garverusa.com for a fee of $30. These documents may be downloaded by selecting this project from the “Plan Room” link, and by entering Quest Project Number 8337030 on the “Browse Projects” page. For assistance and free membership registration, contact QuestCDN at 952.233.1632 or info@questcdn.com . Documents can be examined at Garver, 4701 Northshore Drive, North Little Rock, AR 72118. Addendums to the bid package will be issued through the Garver online Plan Holders List; therefore, all prime bidders shall be responsible for downloading the bid documents from the Garver online plan room in order to be included in the Plan Holders List. Bidders must enter the addenda numbers in Article 3.01 of the Bid Form to verify receipt.
Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. For more information please refer to www.wdol.gov .
Bids shall be accompanied by a cashier’s or certified check upon a national or state bank in an amount of five percent (5%) of the total maximum bid price payable without recourse to the Owner, or a bid bond in the same amount from a reliable surety company, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds within fifteen (15) days after notice of award of Contract to him. Such bid guarantee shall be made payable to BAYOU METO WATER MANAGEMENT DISTRICT.
The successful bidder must furnish a performance and payment bonds upon the form provided in the amount of one hundred per cent (100%) of the contract price from an approved surety company holding a permit from the State of Arkansas to act as surety, or other surety or sureties acceptable to the Owner.
Bids must remain in effect for 60 days after the bid opening date. Within 60 days from the bid date, the Owner may award the contract to the lowest responsive, responsible bidder or reject any or all bids for the project.
The BAYOU METO WATER MANAGEMENT DISTRICT reserves the right to reject any or all bids, to waive irregularities in the bids and bidding deemed to be in the best interests of the BAYOU METO WATER MANAGEMENT DISTRICT, and to reject nonconforming, nonresponsive, or conditional bids.
All questions regarding the project should be directed to:
Engineer: Daniel Hollinger, P.E. Garver
Phone: 501-537-3236
Email: DCHollinger@GarverUSA.com
Owner: BAYOU METO WATER MANAGEMENT DISTRICT
By: Edward Swaim
Title: Executive Director
Date: November 13, 2022
75622817f Show more ≫
Post Date: 11/13 12:00 AM

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >