Arkansas Bids > Bid Detail

Exterior Door Replacement at one site in Mena, AR, and three other sites, Wickes, Cove and Hatfield, AR

Agency: Arkansas Democrat-Gazette
Level of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD15618250691831286
Posted Date: Oct 17, 2022
Due Date: Nov 22, 2022
Source: https://classifieds.arkansason...

00001 INVITATION FOR BIDS
The Housing Authority of the County of Polk, Arkansas, hereinafter called the "Public Housing Agency", or PHA, will receive bids for the Exterior Door Replacement at one site in Mena, AR, and three other sites, Wickes, Cove and Hatfield, AR, until 2:00 PM on Tuesday, November 22, 2022, at the office of the PHA located at 509 South Morrow St., Mena, Arkansas, 71953, at which time and place all bids will be publicly opened and read aloud. Any bid received after the closing time will be returned unopened.
Copies of bidding documents may be obtained from the office of the Architect at the address below by depositing $100.00 for each set of bid documents up to a maximum of two sets. Such deposit will be refunded to each person who submits a bona-fide bid and returns the bidding documents complete and in good condition within seven (7) days after the bid opening.
Additional sets for Prime Bidders and all documents for non-prime bidders such as material suppliers and subcontractors may be purchased at their own expense by sending their check for $50.00 to the Architect at the address below. For viewing prior to making plan deposit, Bidding Documents may be examined at Southern Reprographics, 901 W. 7th Street, and at the following additional places:
Jim McKenzie, Architect, AIA
106 Ashbrook Ln
Russellville, Arkansas, 72802
(479) 968 5481
Housing Authority of the County of Polk
509 South Morrow Street
Mena Arkansas 71953
(479) 394 1565
Photographic Reproductions, Burris, Inc.
113 South Arkansas Ave.
Russellville, Arkansas 72201
Prime bidder’s returning documents prior to the bid date and/or not submitting a bona-fide bid, shall forfeit their deposit unless documents are returned seven (7) calendar days before opening of bids, with notification in writing that a bid will not be submitted. Said notification may be by email. Prime bidders who have not returned the documents by the seventh day after bid date shall forfeit their deposit.
The attention of each bidder is called to the requirements as to conditions of employment to be observed and minimum wage rates (included in this Project Manual) to be paid under the contract. Participation of small, minority and women owned enterprises is encouraged.
All bids must be submitted on forms furnished by the PHA as bound in the Project Manual, submitted in duplicate and submitted in a sealed envelope plainly marked to show the name and address of the bidder, bidders license no., contract job number, and date and time of bid opening. Bidders must conform to the requirements of the Arkansas State Licensing Law for General Contractors and are required to have a current Arkansas Contractor's License in accordance with current Arkansas State Statute 71-701 et seq.
There will be a mandatory "Pre-Bid Conference and walk through" prior to Bid Date, at 10:00 AM, on Tuesday, November 15, 2022. Bids received from contractors not attending the Pre-Bid Conference and Walkthrough or not on the Bidders List, will be returned unopened.
Each bid submitted must contain the following items.
1.Bid Form included in the Project Manual, with all blanks filled in, signed by bidder
2.A cashiers check, certified check, or acceptable bidders bond payable to the Owner in an amount not less than 5% of the largest possible total for the bid submitted must accompany each bid as a guarantee that, if awarded the contract, the bidder will promptly enter into a contract and execute such bonds and insurance as may be required.
3.A fully executed Non-Collusive Affidavit as included in the Project Manual
4. A fully executed Previous Participation Certification, HUD-2530 included in the Project Manual
5. A fully executed Representations, Certifications, and Other Statements of Bidders, HUD-5369-A included in the Project Manual, including:
A. Bidders Section 3 Clause Certification
B. Certification of Bidder regarding Section 3 and Segregated Facilities
C. Certification of Prime Bidder regarding Equal Employment Opportunity
D. Certification of Prime Bidder regarding Non-segregated Facilities
E. Contractors Certification regarding Labor Standards and Prevailing Wage
Rate Requirements.
The successful bidder shall be required to furnish an Arkansas Statutory Performance and Payment Bond or Bonds in the amount of 100 percent of the Contract Bid for contracts that exceed $25,000.
The PHA reserves the right to reject any or all bids or to waive any informalities in the bidding.
No Bidder may withdraw his bid within sixty (60) days after the actual date of the bid opening.
By: Dixie Shrader, Executive Director
Housing Authority of the County of Polk
509 South Morrow St.
Mena, Arkansas 71953-4398
75611911f Show more ≫
Post Date: 10/16 12:00 AM

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >