Climate Controlled Portable Office building L20’ X W25’ X H1
Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159450612449601 |
Posted Date: | Aug 23, 2023 |
Due Date: | Aug 24, 2023 |
Solicitation No: | 36C25623Q1676 |
Source: | https://sam.gov/opp/b5284a6075... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Updated Published Date: Aug 23, 2023 01:04 pm EDT
- Original Published Date: Aug 14, 2023 11:59 pm EDT
- Updated Date Offers Due: Aug 24, 2023 05:00 pm EDT
- Original Date Offers Due: Aug 22, 2023 05:00 pm EDT
- Inactive Policy: Manual
- Updated Inactive Date: Nov 24, 2023
- Original Inactive Date: Nov 24, 2023
-
Initiative:
- None
- Original Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Product Service Code: H154 - QUALITY CONTROL- PREFABRICATED STRUCTURES AND SCAFFOLDING
-
NAICS Code:
- 332311 - Prefabricated Metal Building and Component Manufacturing
-
Place of Performance:
Fayetteville , AR 72703USA
Fayetteville, Arkansas VAMC Station# 564, Logistics Service is requesting the purchase of a Climate Controlled Portable Office building L20’ X W25’ X H12’. This equipment is required to ensure the safety of the material handlers and temperature sensitive materials for the Lab and Pharmacy, during the summer months when temperatures can reach up to 110-degrees Fahrenheit inside
1. Our understanding is that the portable building is a premade structure: 1. Is this an actual premade portable building or a build in place structure? Premade is 6 mo. at least to be fabricated and delivered. The manufacturers don’t offer 12’H walls. We believe the standard height is 9’. The scope calls for the walls to be 3” thick. The manufactured walls come 2” thick.
This is incorrect, the portable building is to be constructed either with leaves that fold in on each other and can be brought into a facility in pieces and then constructed on site. We cannot accommodate a pre-made structure as our doors will not accommodate for this. The manufacturers that we spoke to and provided us with quotes and diagrams had both 12’ high wall and 3” thick walls as well.
2. If it is to be premade, how are you planning to get it into the building? It won’t fit through the doors currently on the building.
The building is to be built on site using materials that were delivered prior to the construction start date.
Question: Are you needing new office buildings or would a previously used office suffice ? If we can discuss budget i can send over a spreadsheet with photos of current offers. Look forward to hearing from you, enjoy your weekend .
Answer: We are looking for a new office space to be constructed inside of the warehouse, I do not believe a previously used office space will suffice as it will need to be deconstructed to be delivered to our facility
- 715 SOUTH PEAR ORCHARD RD., PLAZA 1
- RIDGELAND , MS 39157
- USA
- Debra James
- Debra.James3@va.gov
- Phone Number 5043802553
- Aug 23, 2023 01:04 pm EDTCombined Synopsis/Solicitation (Updated)
- Aug 19, 2023 07:04 pm EDT Combined Synopsis/Solicitation (Updated)
- Aug 17, 2023 12:22 am EDT Combined Synopsis/Solicitation (Updated)
- Aug 14, 2023 11:59 pm EDT Combined Synopsis/Solicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.